{"id":2706,"date":"2025-03-14T08:57:03","date_gmt":"2025-03-14T07:57:03","guid":{"rendered":"https:\/\/rabe-ero.de\/?p=2706"},"modified":"2025-10-28T10:52:52","modified_gmt":"2025-10-28T09:52:52","slug":"press-release-for-the-construction-project-at-daenenstrasse-20-10439-berlin","status":"publish","type":"post","link":"https:\/\/rabe-ero.de\/en\/press-release-for-the-construction-project-at-daenenstrasse-20-10439-berlin\/","title":{"rendered":"Press Release for the Construction Project at D\u00e4nenstra\u00dfe 20, 10439 Berlin"},"content":{"rendered":"<p data-start=\"108\" data-end=\"188\"><strong data-start=\"108\" data-end=\"186\">Press Release for the Construction Project at D\u00e4nenstra\u00dfe 20, 10439 Berlin<\/strong><\/p>\n<p data-start=\"190\" data-end=\"600\" data-is-last-node=\"\" data-is-only-node=\"\"><strong data-start=\"190\" data-end=\"219\">Berlin, February 20, 2025<\/strong> \u2013 A significant milestone has been reached for the construction project at D\u00e4nenstra\u00dfe 20, 10439 Berlin: RABE-ERO GmbH, together with Bettin GmbH as the client and numerous guests, celebrated the topping-out ceremony of the new apartment building. The ceremony was traditionally held in the shell of the rear building, symbolizing the successful progress of the construction work.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2219 size-large aligncenter\" src=\"https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-579x1030.jpg\" alt=\"\" width=\"579\" height=\"1030\" srcset=\"https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-579x1030.jpg 579w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-169x300.jpg 169w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-768x1365.jpg 768w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-864x1536.jpg 864w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-844x1500.jpg 844w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu-397x705.jpg 397w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_5002-neu.jpg 900w\" sizes=\"auto, (max-width: 579px) 100vw, 579px\" \/><\/p>\n<p data-start=\"108\" data-end=\"419\">The construction project involves the development of a modern five-story apartment building with an additional basement and attic. With its well-thought-out architecture, the building blends harmoniously into the established surroundings, creating attractive living space in a sought-after location in Berlin.<\/p>\n<p data-start=\"421\" data-end=\"783\" data-is-last-node=\"\" data-is-only-node=\"\">During the ceremonial event, Mr. Valentino Ivkic, a working student in civil engineering, theCEO of RABE-ERO GmbH, and Dr. Erik Bettin, representing the client, addressed the guests. They acknowledged the efforts of all parties involved and expressed their gratitude for the dedication of the construction workers, planners, and partner companies.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2221 size-full aligncenter\" src=\"https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_4998-neu.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_4998-neu.jpg 768w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_4998-neu-225x300.jpg 225w, https:\/\/rabe-ero.de\/wp-content\/uploads\/IMG_4998-neu-529x705.jpg 529w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/p>\n<p data-start=\"108\" data-end=\"362\">After the speeches, the guests enjoyed the atmospheric setting of the topping-out ceremony. A carefully curated catering selection of food and beverages completed the celebration, providing an opportunity for engaging conversations and social exchange.<\/p>\n<p data-start=\"364\" data-end=\"608\" data-is-last-node=\"\" data-is-only-node=\"\">With the successful completion of the building shell, the project\u2019s completion is now significantly closer. RABE-ERO GmbH continues its work with full energy to complete the construction project on schedule and to the highest quality standards.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press Release for the Construction Project at D\u00e4nenstra\u00dfe 20, 10439 Berlin Berlin, February 20, 2025 \u2013 A significant milestone has been reached for the construction project at D\u00e4nenstra\u00dfe 20, 10439 Berlin: RABE-ERO GmbH, together with Bettin GmbH as the client and numerous guests, celebrated the topping-out ceremony of the new apartment building. The ceremony was [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2187,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-2706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/posts\/2706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/comments?post=2706"}],"version-history":[{"count":2,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/posts\/2706\/revisions"}],"predecessor-version":[{"id":2708,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/posts\/2706\/revisions\/2708"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/media\/2187"}],"wp:attachment":[{"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/media?parent=2706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/categories?post=2706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rabe-ero.de\/en\/wp-json\/wp\/v2\/tags?post=2706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}